Brucejack Mine – Aggregate Processing

Brucejack Mine, Nass Valley

2015-2018
Industry Mining
Services Utilized: Aggregate crushing, screening & washing| Rip Rap
Production: 300,000+ Te of Various Aggregates
Client: Pretivm Resources
Kode provided a crusher system to produce various types of aggregates required for the construction of Pretivm Brucejack Gold Mine. These materials included 20,000 Tonne of concrete aggregates for the build of the mill and all of the base aggregates for the earthworks.
Achievements
Used specialized VSI equipment to produce cubical Concrete Aggregates out of Blast Rock onsite resulting in large savings for mine
Operated crusher through winter conditions to keep schedule
Maneuvre multiple scope changes throughout project as new build continued
Challenges
Access to site is over a glacier crossing
New Mine construction with multiple contractors onsite
Small footprint area with small stockpile areas